365 Data Centers New Jersey (NJ1) is a data center operated by 365 Data Centers in Bridgewater Township, NJ, US. The facility is currently operational. It sits in the Bridgewater Township data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Bridgewater Township — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Bridgewater Township — the market this facility sits in (full deep-dive →).
Bridgewater Township operates as a nascent, operator-fragmented market with zero operational megawatt capacity across 11 tracked facilities. The DCPI framework assigns the market an excess-power score of 34/100 and constraint score of 33/100—both well below investment-grade thresholds. The operator base is heavily fragmented, with five entities classified as "Unknown," two unidentified operators, and only three named facilities: one operated by 365 Data Centers, one by Goldman Sachs, and one by Verizon Wireless NE Headquarters. Critically, the zero-MW total indicates these are either in pre-operational phases, non-colocation assets, or infrastructure currently offline. The DCPI verdict to AVOID reflects structural insufficiency on both supply and demand axes. An excess-power score of 34/100 signals either inadequate electrical infrastructure, uncertain utility commitments, or limited…
Published DC Hub data for this location.
Networks recorded as present at or immediately around 365 Data Centers New Jersey (NJ1) in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 268 operating generating units totalling 15,764 MW within about 50 km of Bridgewater Township, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Bridgewater Township tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="365-data-centers-365-data-centers-new-jersey-nj1-5a98f3ef" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect