What is the Data Center Power Index verdict for Richland Parish?
DC Hub's Data Center Power Index rates Richland Parish AVOID for new data-center power, with a composite score of 32.8 out of 100, as of Nov 23, 2026. Richland Parish is on the MISO grid.
| Market | Richland Parish |
|---|---|
| State or region | LA |
| Grid operator | MISO |
| DCPI verdict | AVOID |
| DCPI composite score | 32.8 of 100 |
| Verdict and scores last changed | Nov 22, 2026 |
| Baton Rouge, LA (MISO) | CAUTION |
| Altoona, IA (MISO) | AVOID |
| Bismarck, ND (MISO) | AVOID |
| Brandon, MS (MISO) | AVOID |
| Byron Center, MI (MISO) | CAUTION |
Source: DC Hub Data Center Power Index (DCPI), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "What is the Data Center Power Index verdict for Richland Parish?", https://dchub.cloud/ai-answers/dcpi-verdict-richland-parish, as of Nov 23, 2026.
The figures and their dates
As of Nov 23, 2026, the figures on this page are: Market: Richland Parish; State or region: LA; Grid operator: MISO; DCPI verdict: AVOID; DCPI composite score: 32.8 of 100; Verdict and scores last changed: Nov 22, 2026; Baton Rouge, LA (MISO): CAUTION; Altoona, IA (MISO): AVOID; Bismarck, ND (MISO): AVOID; Brandon, MS (MISO): AVOID; Byron Center, MI (MISO): CAUTION. Source: DC Hub Data Center Power Index (DCPI), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. The verdict is the Data Center Power Index (DCPI) for the market: BUILD, CAUTION or AVOID for new data-center power, recomputed daily from grid data and interconnection queues. The composite is a 0 to 100 buildability score; it can be compared with other DCPI scores, and it is not a capacity or a percentage. The other markets listed are ones DC Hub scores on the same grid operator, each with its own verdict. The date is the day the data on this page last changed. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on Richland Parish, open the Richland Parish market page, Richland Parish DCPI breakdown, or any of the data centers tracked there:
- Meta Hyperion Building 9
- Meta Hyperion Building 1
- Meta Hyperion Building 2
- Meta Hyperion Building 3
- Meta Hyperion Building 4
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.