Meta Hyperion Building 2 is a data center operated by Meta in Richland Parish, LA, US. It carries a reported power capacity of 555.0 MW and is currently under construction. It sits in the Richland Parish data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 13.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Richland Parish — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Richland Parish — the market this facility sits in (full deep-dive →).
Richland Parish hosts a concentrated but constrained data center footprint, with 22 tracked facilities totaling 19,500 MW dominated by Meta's dual-entity presence. The market's DCPI scoring—45/100 for excess power capacity and 37/100 for constraint relief—reflects a fundamental supply-demand imbalance that presents material risk to investors. Meta operates 13 facilities while Meta Platforms controls an additional 9, establishing near-total operator concentration in a parish where infrastructure growth has not kept pace with deployment velocity. The AVOID verdict on Richland Parish reflects hard constraints on both entry and expansion. An excess-power score of 45/100 signals insufficient incremental capacity headroom relative to existing and pipeline demand; the constraint score of 37/100 indicates limited near-term relief mechanisms through grid reinforcement, water availability, or…
Published DC Hub data for this location.
Comparable facilities in Richland Parish tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="meta-meta-hyperion-building-2-b8b8ed62" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=meta-meta-hyperion-building-2-b8b8ed62