What is the Data Center Power Index verdict for Byron Center?
DC Hub's Data Center Power Index rates Byron Center CAUTION for new data-center power, with a composite score of 47.4 out of 100, as of Nov 23, 2026. Byron Center is on the MISO grid.
| Market | Byron Center |
|---|---|
| State or region | MI |
| Grid operator | MISO |
| DCPI verdict | CAUTION |
| DCPI composite score | 47.4 of 100 |
| Verdict and scores last changed | Nov 23, 2026 |
| Detroit, MI (MISO) | CAUTION |
| Grand Rapids, MI (MISO) | CAUTION |
| Lansing, MI (MISO) | CAUTION |
| Southfield, MI (MISO) | CAUTION |
| Troy, MI (MISO) | CAUTION |
Source: DC Hub Data Center Power Index (DCPI), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "What is the Data Center Power Index verdict for Byron Center?", https://dchub.cloud/ai-answers/dcpi-verdict-byron-center, as of Nov 23, 2026.
The figures and their dates
As of Nov 23, 2026, the figures on this page are: Market: Byron Center; State or region: MI; Grid operator: MISO; DCPI verdict: CAUTION; DCPI composite score: 47.4 of 100; Verdict and scores last changed: Nov 23, 2026; Detroit, MI (MISO): CAUTION; Grand Rapids, MI (MISO): CAUTION; Lansing, MI (MISO): CAUTION; Southfield, MI (MISO): CAUTION; Troy, MI (MISO): CAUTION. Source: DC Hub Data Center Power Index (DCPI), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. The verdict is the Data Center Power Index (DCPI) for the market: BUILD, CAUTION or AVOID for new data-center power, recomputed daily from grid data and interconnection queues. The composite is a 0 to 100 buildability score; it can be compared with other DCPI scores, and it is not a capacity or a percentage. The other markets listed are ones DC Hub scores on the same grid operator, each with its own verdict. The date is the day the data on this page last changed. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on Byron Center, open the Byron Center market page, Byron Center DCPI breakdown, or any of the data centers tracked there:
- 123.NET - DC4 - 400 76th St SW
- ManagedWay BYK1, Byron Center Data Center
- US Signal - Grand Rapids South
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.