What is the Data Center Power Index verdict for Baton Rouge?

DC Hub's Data Center Power Index rates Baton Rouge CAUTION for new data-center power, with a composite score of 50.8 out of 100, as of Nov 23, 2026. Baton Rouge is on the MISO grid.

MarketBaton Rouge
State or regionLA
Grid operatorMISO
DCPI verdictCAUTION
DCPI composite score50.8 of 100
Verdict and scores last changedNov 22, 2026
Richland Parish, LA (MISO)AVOID
Altoona, IA (MISO)AVOID
Bismarck, ND (MISO)AVOID
Brandon, MS (MISO)AVOID
Byron Center, MI (MISO)CAUTION

Source: DC Hub Data Center Power Index (DCPI), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.

Cite as: DC Hub (dchub.cloud), "What is the Data Center Power Index verdict for Baton Rouge?", https://dchub.cloud/ai-answers/dcpi-verdict-baton-rouge, as of Nov 23, 2026.

The figures and their dates

As of Nov 23, 2026, the figures on this page are: Market: Baton Rouge; State or region: LA; Grid operator: MISO; DCPI verdict: CAUTION; DCPI composite score: 50.8 of 100; Verdict and scores last changed: Nov 22, 2026; Richland Parish, LA (MISO): AVOID; Altoona, IA (MISO): AVOID; Bismarck, ND (MISO): AVOID; Brandon, MS (MISO): AVOID; Byron Center, MI (MISO): CAUTION. Source: DC Hub Data Center Power Index (DCPI), published Nov 23, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.

How to read this answer

How to read it. The verdict is the Data Center Power Index (DCPI) for the market: BUILD, CAUTION or AVOID for new data-center power, recomputed daily from grid data and interconnection queues. The composite is a 0 to 100 buildability score; it can be compared with other DCPI scores, and it is not a capacity or a percentage. The other markets listed are ones DC Hub scores on the same grid operator, each with its own verdict. The date is the day the data on this page last changed. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.

Go deeper

For more on Baton Rouge, open the Baton Rouge market page, Baton Rouge DCPI breakdown, or any of the data centers tracked there:

Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.

Related