Dallas or Phoenix for a data center?
DC Hub rates Dallas CAUTION and Phoenix CAUTION for new data-center power. Figures as of Nov 24, 2026.
| Market | Dallas | Phoenix |
|---|---|
| DCPI verdict | CAUTION | CAUTION |
| Operational (verified sites) | 2,166 MW | 2,341 MW |
| Under construction (verified sites) | 1,375 MW | 557 MW |
| Planned (verified sites) | 1,095 MW | 0 MW |
| All tracked sites that report MW | about 7,017 MW | about 4,323 MW (floor) |
Source: DC Hub Data Center Power Index, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "Dallas or Phoenix for a data center?", https://dchub.cloud/ai-answers/dallas-vs-phoenix-for-data-centers, as of Nov 24, 2026.
The figures and their dates
As of Nov 24, 2026, the figures on this page are: Market: Dallas | Phoenix; DCPI verdict: CAUTION | CAUTION; Operational (verified sites): 2,166 MW | 2,341 MW; Under construction (verified sites): 1,375 MW | 557 MW; Planned (verified sites): 1,095 MW | 0 MW; All tracked sites that report MW: about 7,017 MW | about 4,323 MW (floor). Source: DC Hub Data Center Power Index, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. The comparison uses the same published verdicts and ISO-level figures as each market's own page, side by side. It ranks neither market above the other beyond what those figures state. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on Dallas and Phoenix, open the Dallas market page, Dallas DCPI breakdown, Phoenix market page, Phoenix DCPI breakdown, or any of the data centers tracked there:
- Yondr Lancaster (Dallas Campus)
- DataBank Red Oak Mega Campus
- Anthropic Texas AI Campus
- Microsoft Azure West US 3 (Phoenix)
- Compass Goodyear Campus (Phoenix)
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.