Atlanta or Dallas for a data center?
DC Hub rates Atlanta AVOID and Dallas CAUTION for new data-center power. Figures as of Nov 24, 2026.
| Market | Atlanta | Dallas |
|---|---|
| DCPI verdict | AVOID | CAUTION |
| Operational (verified sites) | 574 MW | 2,166 MW |
| Under construction (verified sites) | 530 MW | 1,375 MW |
| Planned (verified sites) | 60 MW | 1,095 MW |
| All tracked sites that report MW | about 2,332 MW | about 7,017 MW (floor) |
Source: DC Hub Data Center Power Index, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "Atlanta or Dallas for a data center?", https://dchub.cloud/ai-answers/atlanta-vs-dallas-for-data-centers, as of Nov 24, 2026.
The figures and their dates
As of Nov 24, 2026, the figures on this page are: Market: Atlanta | Dallas; DCPI verdict: AVOID | CAUTION; Operational (verified sites): 574 MW | 2,166 MW; Under construction (verified sites): 530 MW | 1,375 MW; Planned (verified sites): 60 MW | 1,095 MW; All tracked sites that report MW: about 2,332 MW | about 7,017 MW (floor). Source: DC Hub Data Center Power Index, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. The comparison uses the same published verdicts and ISO-level figures as each market's own page, side by side. It ranks neither market above the other beyond what those figures state. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on Atlanta and Dallas, open the Atlanta market page, Atlanta DCPI breakdown, Dallas market page, Dallas DCPI breakdown, or any of the data centers tracked there:
- Microsoft Fairwater AI Superfactory
- Switch Atlanta Campus
- Yondr Atlanta 1
- Yondr Lancaster (Dallas Campus)
- DataBank Red Oak Mega Campus
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.