Chicago or Columbus for a data center?
DC Hub rates Chicago AVOID and Columbus AVOID for new data-center power. Both sit in PJM, where typical time to power is about 50 months (ISO-level). Figures as of Nov 24, 2026.
| Market | Chicago | Columbus |
|---|---|
| DCPI verdict | AVOID | AVOID |
| Operational (verified sites) | 959 MW | 576 MW |
| Under construction (verified sites) | 0 MW | 100 MW |
| Planned (verified sites) | 0 MW | 500 MW |
| All tracked sites that report MW | about 1,521 MW | about 2,111 MW (floor) |
Source: DC Hub Data Center Power Index, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "Chicago or Columbus for a data center?", https://dchub.cloud/ai-answers/chicago-vs-columbus-for-data-centers, as of Nov 24, 2026.
The figures and their dates
As of Nov 24, 2026, the figures on this page are: Market: Chicago | Columbus; DCPI verdict: AVOID | AVOID; Operational (verified sites): 959 MW | 576 MW; Under construction (verified sites): 0 MW | 100 MW; Planned (verified sites): 0 MW | 500 MW; All tracked sites that report MW: about 1,521 MW | about 2,111 MW (floor). Source: DC Hub Data Center Power Index, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. The comparison uses the same published verdicts and ISO-level figures as each market's own page, side by side. It ranks neither market above the other beyond what those figures state. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on Chicago and Columbus, open the Chicago market page, Chicago DCPI breakdown, Columbus market page, Columbus DCPI breakdown, or any of the data centers tracked there:
- CoreWeave Chicago Campus
- Equinix CH Campus
- Stack Chicago
- Stargate Ohio Campus
- Google Columbus Data Center
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.