Where can I find colocation capacity in Santa Clara, and how soon can it be powered?
This page lists no Santa Clara colocation space and states no available MW; DC Hub Capacity Source holds the listings and needs a sign-in. What DC Hub can verify live for Santa Clara: its Data Center Power Index rates it CAUTION for new data-center power (composite score 44.2 of 100) and its modelled time to power for a new large load is about 48 months, a model estimate and not a utility date, as of Nov 24, 2026.
| Market | Santa Clara |
|---|---|
| Grid operator or balancing authority | CAISO |
| DCPI verdict | CAUTION, composite score 44.2 of 100, as of Nov 24, 2026. Source: DC Hub Data Center Power Index (DCPI) |
| Modelled time to power, new large load | about 48 months, a model estimate and not a utility date, as of Nov 24, 2026. Source: DC Hub Data Center Power Index (DCPI) |
| CAISO interconnection queue headline | 164.8 GW, summed from 3 source files; the oldest is dated Jul 16, 2026, so the total is no newer than that. File dates, newest first: publicqueuereport.xlsx Nov 22, 2026; cluster-16-queue-report.xlsx Oct 16, 2026; cluster-15-interconnection-requests.xlsx Jul 16, 2026. Source: CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI). |
| What DC Hub does not hold, and where it is held | Leasing comps and market supply research: use datacenterHawk. Facility and provider listings: use Baxtel. Representation, market reports and deal execution: work with CBRE. Representation, market reports and deal execution: work with JLL. Registry reviewed Oct 27, 2026, listed at https://dchub.cloud/partners. |
| Santa Clara colocation listings on this page | None. Browse DC Hub Capacity Source at https://dchub.cloud/listings?src=ai-answers (sign-in required). |
Sources, each dated in the table above: DC Hub DCPI; CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI). Data: DC Hub (dchub.cloud), CC BY 4.0. No OpenStreetMap-derived layer is used on this page.
Cite as: DC Hub (dchub.cloud), "Where can I find colocation capacity in Santa Clara, and how soon can it be powered?", https://dchub.cloud/ai-answers/colocation-capacity-santa-clara, as of Nov 24, 2026.
Where the capacity listings are
DC Hub Capacity Source lists powered land, powered shells, turnkey and colocation capacity. Browsing it needs a sign-in at https://dchub.cloud/listings?src=ai-answers, and an AI agent can query it with the source_capacity tool. DC Hub works alongside providers and does not own or operate facilities. This page does not say that any listing exists in this market, and it states no MW and no count of listings.
How to read this
The Data Center Power Index verdict describes the outlook for new power in the market. It is not a judgement of the market's quality or size. The time to power is a modelled estimate for a new large load, so it is not a utility date, and space that is already energized can be faster. The queue headline measures requests for grid access across the whole grid operator. It is not spare capacity in this market and not a forecast of what will be built.
Questions for an operator
Useful questions to put to an operator for a requirement in kW or MW: how much is available in one contiguous block, and what minimum and maximum amount the operator will contract; whether that power is energized today or planned, and if planned, which utility agreement and long-lead equipment it depends on; and the ready-for-service date, with what would move it. Ask for each in writing.
DCPI is a daily score of where data centers can get grid power, across 300+ markets.
Methodology and citing
The method is published at /dcpi/methodology, and each figure above carries its own date and source. Cite the as-of date: DC Hub (dchub.cloud), as of Nov 24, 2026.