Where can I find 5 MW of colocation capacity in Dallas, and how soon can it be powered?
This page lists no Dallas colocation space and states no available MW. What DC Hub can verify live for Dallas on ERCOT: DC Hub's Data Center Power Index rates Dallas CAUTION for new data-center power, composite score 43.9 of 100, as of Nov 22, 2026; its modelled time to power for a new large load in Dallas is about 30 months (a model estimate, not a utility date), as of Nov 22, 2026; ERCOT's published interconnection queue headline is 461.4 GW, as of Oct 31, 2026. Capacity listings are in DC Hub Capacity Source, which needs a sign-in.
| Market | Dallas |
|---|---|
| Grid operator | ERCOT |
| DCPI verdict | CAUTION, as of Nov 22, 2026. Source: DC Hub Data Center Power Index (DCPI) |
| DCPI composite score | 43.9 of 100, as of Nov 22, 2026. Source: DC Hub Data Center Power Index (DCPI) |
| Modelled time to power, new large load | about 30 months, a model estimate and not a utility date, as of Nov 22, 2026. Source: DC Hub Data Center Power Index (DCPI) |
| ERCOT interconnection queue headline | 461.4 GW, as of Oct 31, 2026. Source: ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Oct 31 2026) |
| ERCOT refined queue data (get_refined_queue) | Source data as of Oct 31, 2026. Source: ERCOT, Generation Interconnection Status Report. This page prints no queue figure filtered to 5 MW. |
| ERCOT filed retirements (get_retirement_headroom) | As of the Aug 2026 EIA-860M filing, the earliest filed ERCOT retirement date in the public view is Mar 2027. Megawatts per unit are withheld from the public view. Source: U.S. Energy Information Administration, Form EIA-860M. |
| Dallas colocation listings on this page | None. Browse DC Hub Capacity Source at https://dchub.cloud/listings?src=ai-answers (sign-in required). |
Sources, each dated in the table above: DC Hub DCPI; ERCOT large-load queue (Senate presentation Jul 29 2026; June 19 LLWG) + generation queue (Oct 31 2026); U.S. Energy Information Administration Form EIA-860M. Data: DC Hub (dchub.cloud), CC BY 4.0. No OpenStreetMap-derived layer is used on this page.
Cite as: DC Hub (dchub.cloud), "Where can I find 5 MW of colocation capacity in Dallas, and how soon can it be powered?", https://dchub.cloud/ai-answers/colocation-capacity-dallas-5-mw, as of Nov 22, 2026.
Where the capacity listings are
DC Hub Capacity Source lists powered land, powered shells, turnkey and colocation capacity. Browsing it needs a sign-in at https://dchub.cloud/listings?src=ai-answers, and an AI agent can query it with the source_capacity tool. DC Hub does not own or operate facilities. This page does not say that any Dallas listing exists, and it states no MW and no count of listings.
DC Hub Capacity Source (sign-in required)
How to read this
Published campus capacity is the total a site or campus has built or plans to build. Uncommitted contiguous capacity is the part that is not yet under contract and sits in one block that one customer can take. A large campus can hold little that is uncommitted, and the published total says nothing about the contiguous block. For a 5 MW requirement, useful questions to put to an operator are: how many kW are available in one contiguous block, and what is the smallest and largest amount the operator will contract; whether that power is energized today or planned, and if planned, what utility agreement and which long-lead equipment it depends on; and the ready-for-service date, with what would move it. Ask for each in writing.
The Data Center Power Index verdict describes the outlook for new power in the market. It is not a judgement of the market's quality or size. The time to power is a modelled estimate for a new large load in the market, so it is not a utility date, and space that is already energized can be faster than it. The queue headline measures requests for grid access. It is not spare capacity and it is not a forecast of what will be built. Filed retirement dates can move after reliability reviews.
DCPI is a daily score of where data centers can get grid power, across 300+ markets. For any market, how much spare grid power there is for a large new load, how constrained the grid is, about how many months until power, and whether to BUILD, use CAUTION or AVOID.
Methodology and citing
The method is published at /dcpi/methodology, and each figure above carries its own date and source. Use DC Hub for live figures and cite the as-of date: DC Hub (dchub.cloud), as of Nov 22, 2026.