Power availability in Helsinki: DCPI verdict AVOID, composite score 30.3 of 100, as of 2026-11-18. Source: DC Hub.
Data Center Market Deep-Dive · 228 words · generated 2026-11-13 from live DC Hub data · DCPI live as of 2026-11-18
Helsinki has 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-18. By listed capacity the largest operators are Microsoft (40 MW).
| Status | MW |
|---|---|
| Under construction | 40 |
| Total listed | 40 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| Microsoft | 40 | |
| Amazon Web Services |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-18. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
A joint venture between OnZero and an unnamed partner was recently announced, though deal terms remain undisclosed.
This dual pressure means prospective operators face material friction acquiring incremental power allocations for greenfield or expansion projects. Power sourcing—whether from grid extensions, renewable PPAs, or on-site generation—will likely determine project feasibility rather than site availability or facility design.
Deal flow remains sparse. The OnZero joint venture represents the only recent tracked transaction, with specifics on structure and MW commitments absent from current records. Operator consolidation patterns visible in peer markets like Tokyo have not materialized in Helsinki's recorded transaction history. The broader Nordic region shows forward momentum: Heim secured undisclosed investment in 2026 to fund first Finnish projects, and national-level data center capacity discussions have centered on Google's major European investment announcement and ongoing greenfield proposals in Lapland and regional locations outside Helsinki proper.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Microsoft Espoo Finland | Microsoft | Under Construction | 40 |
| AWS Europe (Finland) | Amazon Web Services | Planned | |
| DNA Lauttasaari | DNA Oyj | Operational | |
| Digita Helsinki Pasila Broadcasting Tower | Digita Oy | Operational | |
| Elisa Helsinki Lauttasaari | Elisa Oyj | Operational | |
| Equinix HE1 Helsinki | Equinix | Operational | |
| Equinix HE5 - Helsinki, Viikinmäki | Equinix | Operational | |
| Hetzner Helsinki DC | Hetzner | Operational | |
| LocalNet Lauttasaari (Nebula) | Telia Company | Operational | |
| Mediam Helsinki Datacenter | Mediam Oy | Operational | |
| Microsoft Azure Finland South | Microsoft | Planned | |
| Telia Espoo Data Center | Telia | Operational | |
| Telia HDC | Telia Finland Oyj | Operational | |
| Telia Helsinki Datacenter | Telia Company | Operational | |
| Verne Global HELSINKI | Verne Global | Operational | |
| atNorth FIN01 | atNorth | Operational |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Finland.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Helsinki: 600 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/helsinki/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-13, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load