Helsinki data center market

Power availability in Helsinki: DCPI verdict AVOID, composite score 30.3 of 100, as of 2026-11-18. Source: DC Hub.

Data Center Market Deep-Dive · 228 words · generated 2026-11-13 from live DC Hub data · DCPI live as of 2026-11-18

DCPI Score30.3/100
MW, all listings600sum of the sites that report MW; most do notany status, unverified listings included
VerdictAVOID

Helsinki at a glance

Helsinki has 40 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-18. By listed capacity the largest operators are Microsoft (40 MW).

Capacity by status, as of 2026-11-18
StatusMW
Under construction40
Total listed40

Developers building or planning in Helsinki

OperatorUnder construction MWPlanned MW
Microsoft40
Amazon Web Services

Source: DC Hub (dchub.cloud), facility records as of 2026-11-18. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.

Colocation lease rates in Helsinki

DC Hub does not hold a lease-rate figure for this market yet.

A joint venture between OnZero and an unnamed partner was recently announced, though deal terms remain undisclosed.

This dual pressure means prospective operators face material friction acquiring incremental power allocations for greenfield or expansion projects. Power sourcing—whether from grid extensions, renewable PPAs, or on-site generation—will likely determine project feasibility rather than site availability or facility design.

Deal flow remains sparse. The OnZero joint venture represents the only recent tracked transaction, with specifics on structure and MW commitments absent from current records. Operator consolidation patterns visible in peer markets like Tokyo have not materialized in Helsinki's recorded transaction history. The broader Nordic region shows forward momentum: Heim secured undisclosed investment in 2026 to fund first Finnish projects, and national-level data center capacity discussions have centered on Google's major European investment announcement and ongoing greenfield proposals in Lapland and regional locations outside Helsinki proper.

Data centers in Helsinki

FacilityOperatorStatusMW
Microsoft Espoo FinlandMicrosoftUnder Construction40
AWS Europe (Finland)Amazon Web ServicesPlanned
DNA LauttasaariDNA OyjOperational
Digita Helsinki Pasila Broadcasting TowerDigita OyOperational
Elisa Helsinki LauttasaariElisa OyjOperational
Equinix HE1 HelsinkiEquinixOperational
Equinix HE5 - Helsinki, ViikinmäkiEquinixOperational
Hetzner Helsinki DCHetznerOperational
LocalNet Lauttasaari (Nebula)Telia CompanyOperational
Mediam Helsinki DatacenterMediam OyOperational
Microsoft Azure Finland SouthMicrosoftPlanned
Telia Espoo Data CenterTeliaOperational
Telia HDCTelia Finland OyjOperational
Telia Helsinki DatacenterTelia CompanyOperational
Verne Global HELSINKIVerne GlobalOperational
atNorth FIN01atNorthOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Finland.

More on Helsinki

Email me when the Helsinki DCPI verdict changes

Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Helsinki: 600 MW tracked, any status — live, cited, and queryable by API or MCP.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/helsinki/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-13, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load