{"generated_at": "2026-11-13T09:01:30.842306+00:00", "key_stats": {"computed": "2026-11-13T08:49:01.746492+00:00", "constraint": null, "dcpi_score": 30.3, "excess": null, "facility_count": 76, "mw_reporting_count": 2, "name": "Helsinki", "recent_deals": [{"buyer": "OnZero", "date": null, "id": "ext_146c0cb8f0d2e3c065bf", "mw": null, "seller": null, "source_url": "https://www.datacenterdynamics.com/en/news/onzero-partners-with-helen-to-connect-helsinki-ai-data-center-to-district-heating-network/", "type": "jv", "value": null, "value_unit": "usd_millions"}], "slug": "helsinki", "state": "FI", "top_operators": [{"count": 7, "name": "Equinix"}, {"count": 7, "name": "Unknown"}, {"count": 5, "name": ""}, {"count": 3, "name": "Telia Company"}, {"count": 2, "name": "Microsoft"}], "total_mw": 600.0, "verdict": "AVOID"}, "model": "claude-haiku-4-5", "name": "Helsinki", "narrative_md": "# Helsinki Data Center Market Brief\n\nHelsinki's tracked footprint spans 76 facilities totaling 600 MW across operational, under-construction, and planned sites. Equinix leads operator presence with seven sites, followed by Telia Company with three and Microsoft with two. A joint venture between OnZero and an unnamed partner was recently announced, though deal terms remain undisclosed.\n\nThis dual pressure means prospective operators face material friction acquiring incremental power allocations for greenfield or expansion projects. Power sourcing\u2014whether from grid extensions, renewable PPAs, or on-site generation\u2014will likely determine project feasibility rather than site availability or facility design.\n\nDeal flow remains sparse. The OnZero joint venture represents the only recent tracked transaction, with specifics on structure and MW commitments absent from current records. Operator consolidation patterns visible in peer markets like Tokyo have not materialized in Helsinki's recorded transaction history. The broader Nordic region shows forward momentum: Heim secured undisclosed investment in 2026 to fund first Finnish projects, and national-level data center capacity discussions have centered on Google's major European investment announcement and ongoing greenfield proposals in Lapland and regional locations outside Helsinki proper.", "slug": "helsinki", "word_count": 228, "_gated": true, "_locked_fields": ["constraint", "constraint_score", "excess", "excess_power_score", "time_to_power_months", "top_opportunities_json", "top_risks_json"], "_upgrade_cta": "BUILD/CAUTION/AVOID verdicts, the composite score and the market list are free. The DCPI sub-scores (excess-power, grid-constraint, time-to-power) and risk/opportunity detail come with full DC Hub access: https://dchub.cloud/pricing."}