Every substation tracked from HIFLD + state utility filings — voltage class, capacity rating, operating status, ownership. Use it to scout data center sites near transmission backbones.
A hyperscale data center needs 50-500 MW. Tapping the grid means an interconnect to a substation with enough headroom, the right voltage class, and a queue that won't push you 5+ years out. DC Hub's substation atlas lets you scout candidate sites in minutes instead of weeks — filter by capacity, voltage, ownership, or proximity to fiber.
Pair this layer with DCPI verdict scoring + the capacity-pipeline overlay and you have the same site-selection backbone our Pro subscribers use.
Quick-jump into the substation count + map for each U.S. state: