Zayo Washington DC - 2100 M Street NW

Zayo Washington DC - 2100 M Street NW is a data center operated by Zayo Group in Washington, DC, US. The facility is currently operational. It sits in the Washington data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 50.9-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
Washington
State
DC
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Washington — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Washington — the market this facility sits in (full deep-dive →).

Washington, DC's data center market is severely underdeveloped with only 23 tracked facilities representing 0 MW of measurable capacity. The operator base is fragmented across five primary players—Equinix and CoreSite each operate two facilities, while Cogent Communications maintains three separate locations across Herndon, Washington, and Vienna. This geographic and operational fragmentation reflects a market that has failed to consolidate around anchor infrastructure, a critical disadvantage in a sector increasingly dominated by hyperscale consolidation. The DCPI verdict of AVOID, driven by an excess-power score of 35/100 and constraint rating of 50/100, signals fundamental structural problems for prospective investors and operators. The excess-power metric indicates severe undersupply relative to regional demand, suggesting chronic capacity shortfalls that would force tenants to seek…

Location

Area Washington, DC, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketWashington
Grid operatorPJM
Data Center Power IndexCAUTION
Est. time to power50.9 months
LocationWashington, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Zayo Washington DC - 2100 M Street NW in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Allied Telecom GroupRealConnect, Inc

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 123 operating generating units totalling 8,284 MW within about 50 km of Washington, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas6,382 MW · 17 units · 77%
Coal1,370 MW · 2 units · 17%
Bioenergy281 MW · 6 units · 3%
Utility-Scale Solar251 MW · 98 units · 3%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Washington tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="zayo-group-zayo-washington-dc-2100-m-street-nw-0ef0e466" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind