Yondr Chicago ORD-1

Yondr

Chicago ORD-1 is a data center operated by Yondr in Chicago, IL, US. It carries a reported power capacity of 150.0 MW and is currently under construction. It sits in the Chicago data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 21.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
150.0 MW
Status
Under Construction
City
Chicago
State
IL
Country
US
Coordinates
41.8781, -87.6298
Address
Chicago, IL

Market intelligence

AVOID

Data Center Power Index verdict for Chicago — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Chicago — the market this facility sits in (full deep-dive →).

Chicago's data center footprint spans 272 tracked facilities totaling 1,563 MW, dominated by Digital Realty's 17-site portfolio, followed by NTT, Centersquare, and CyrusOne each operating between 5–6 facilities. The market exhibits a paradoxical constraint profile: excess-power availability scores 44/100 indicating modest supply headroom, but constraint pressure registers 56/100, signaling that grid, cooling, or real-estate bottlenecks are the binding limitation, not fuel. This asymmetry reflects Chicago's mature but geographically fragmented infrastructure, where capacity exists but is not uniformly deployable. The DCPI verdict of AVOID is unambiguous for acquisition investors and operators pursuing greenfield or brownfield expansion. A constraint score of 56/100 means new entrants or capital-intensive scale-ups will face meaningful friction on permitting, interconnection, or…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketChicago
Grid operatorPJM
DC Hub Power IndexAVOID
Est. time to power21.6 months
LocationChicago, US
Reported capacity150.0 MW

Power generation nearby

DC Hub tracks 81 operating generating units totalling 6,595 MW within about 50 km of Chicago, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas6,535 MW · 50 units · 99%
Utility-Scale Solar59 MW · 31 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Chicago tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="yondr-chicago-ord-1-fafcc40b" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=yondr-chicago-ord-1-fafcc40b
Schema, units and the population behind every count: https://dchub.cloud/bind