Webnx Ogden is a data center in Salt Lake City, US. The facility is currently announced. It sits in the Salt Lake City data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 19.4-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Salt Lake City — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Salt Lake City — the market this facility sits in (full deep-dive →).
Salt Lake City's data center market remains fragmented and power-constrained, with 89 tracked facilities totaling 604 MW spread across a competitive operator base dominated by Flexential's dual presence 17 facilities combined. The excess-power DCPI score of 54/100 signals adequate but not abundant capacity headroom, while the constraint rating of 47/100 indicates meaningful structural limitations on expansion velocity. This mixed profile reflects a maturing regional market caught between growing hyperscaler interest in Utah's renewable resources and the hard infrastructure ceiling imposed by grid interconnection and water availability. For data center investors and operators, the CAUTION verdict warrants selective deployment. The excess-power score above 50 means new entrants won't face immediate capacity starvation, but the constraint score below the median threshold signals that…
Published DC Hub data for this location.
Comparable facilities in Salt Lake City tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="webnx-ogden-a971e9d0" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect