Genome Data Center is a data center operated by Washington University in St. Louis in Saint Louis, MO, US. The facility is currently operational. It sits in the Saint Louis data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 17.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Saint Louis — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Saint Louis — the market this facility sits in (full deep-dive →).
Saint Louis operates as a fragmented secondary market with minimal institutional infrastructure. Four tracked facilities currently total 0 MW of operational capacity, with operator bases split evenly among Arcadian Infracom, Netrality Data Centers, an unnamed provider, and Washington University in St. Louis. The absence of reported capacity across these four tracked nodes suggests either nascent build-out phases, non-hyperscale positioning, or data gaps in current inventory. No recent M&A activity has been recorded in the tracked dataset, indicating a dormant transaction environment. The DCPI verdict of CAUTION excess-power 56/100, constraint 37/100 signals mixed fundamentals unsuitable for aggressive entry strategies. The excess-power score of 56—moderately favorable—reflects regional infrastructure investment, particularly Amazon's announced $10 billion Missouri commitment on the…
Published DC Hub data for this location.
Comparable facilities in Saint Louis tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="washington-university-in-st-louis-genome-data-center-95d6b220" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=washington-university-in-st-louis-genome-data-center-95d6b220