vXchnge Raleigh-Durham (NC01) is a data center operated by vXchnge in Durham, NC, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Durham data-center market on the SERC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 11.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Durham — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Durham — the market this facility sits in (full deep-dive →).
Durham's data center market comprises 18 tracked facilities totaling 31 MW across a fragmented operator base, with an elevated excess-power score of 36/100 paired against a moderate constraint score of 33/100. The tracked portfolio is split among five identifiable operators, with CyrusOne holding the largest position at three facilities, while two operators remain unidentified in available records. The absence of recent M&A activity in Durham stands in sharp contrast to broader regional consolidation patterns and the sustained capital deployment observed in mega-facility acquisitions elsewhere. The CAUTION verdict reflects a market in transition rather than one fundamentally closed to investment. An excess-power score of 36/100 signals meaningful unutilized generation or distribution capacity—a positive indicator for brownfield expansion or lease-up scenarios, but one that tempers…
Published DC Hub data for this location.
Comparable facilities in Durham tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="vxchnge-vxchnge-raleigh-durham-nc01-77181db7" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=vxchnge-vxchnge-raleigh-durham-nc01-77181db7