Vorarlberger Informatik- und Telekommunikationsdienstleistungsgesellschaft mbH Datacenter Weidach

Datacenter Weidach is a data center operated by Vorarlberger Informatik- und Telekommunikationsdienstleistungsgesellschaft mbH in Bregenz, Vorarlberg, AT. The facility is currently operational. It sits in the Zurich data-center market on the ENTSOE-CH grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 33.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Bregenz
State
Vorarlberg
Country
AT

Market intelligence

AVOID

Data Center Power Index verdict for Zurich — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Zurich — the market this facility sits in (full deep-dive →).

Zurich's data center market comprises 92 tracked facilities totaling 110 MW, positioning it as a regional hub constrained by both power availability and operational limits. Equinix commands the largest footprint with 10 facilities across its two listed entities 5 MW each, while Vantage Data Centers, Orange Business Services Zurich, and Init7 Winterthur collectively operate 10 facilities. The market has seen no recent M&A activity, suggesting limited transaction momentum despite Switzerland's status as a financial and tech center. The DCPI verdict of AVOID is unambiguous: the excess-power score of 25/100 paired with a constraint rating of 55/100 signals fundamental supply-side vulnerability. With excess capacity scored at just one-quarter of optimal levels, the market is operating near utilization thresholds, meaning available power for new tenant onboarding is severely limited. The…

Location

Area Bregenz, Vorarlberg, AT

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketZurich
Grid operatorENTSOE-CH
Data Center Power IndexAVOID
Est. time to power33.5 months
LocationBregenz, AT

Fiber connectivity

Networks recorded as present at or immediately around Datacenter Weidach in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

VTG

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 74 operating generating units totalling 1,255 MW within about 50 km of Bregenz, AT. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Hydropower1,016 MW · 8 units · 81%
Utility-Scale Solar219 MW · 65 units · 17%
Oil/Gas20 MW · 1 unit · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="vorarlberger-informatik-und-telekommunikationsdienstleistungsgesellschaft-mbh-datacenter-weidach-cd3ed824" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind