Vodafone Winterton Cable Landing Station

GB

Winterton Cable Landing Station is a data center operated by Vodafone in GB. It carries a reported power capacity of 5.0 MW and is currently operational.

Power
5.0 MW
Status
Operational
Country
GB

Source: OpenStreetMap · As of: · Basis: cited (what this means)

Location

Area GB

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

Reported capacity5.0 MW

Power generation nearby

DC Hub tracks 44 operating generating units totalling 1,159 MW within about 50 km of GB. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas420 MW · 1 unit · 36%
Wind406 MW · 9 units · 35%
Utility-Scale Solar274 MW · 32 units · 24%
Bioenergy59 MW · 2 units · 5%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Unlock power scores for this site → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="vodafone-winterton-cable-landing-station-69576eef" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind