AAPT Brisbane is a data center operated by Vocus Group in Brisbane, QLD, AU. The facility is currently operational. It sits in the Brisbane data-center market on the AEMO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 32.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Brisbane — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Brisbane — the market this facility sits in (full deep-dive →).
Brisbane's data center market remains nascent, with 62 tracked facilities totaling 0 MW of operational capacity—a figure that understates the market's physical presence but reflects the absence of hyperscale infrastructure. Pipe Networks operates the largest footprint with four facilities, followed by Vocus Group with three and both Equinix and NEXTDC with two each. The market has attracted no tracked M&A activity to date, indicating either stability among existing operators or limited investor appetite for local assets at current valuations. The DCPI verdict of AVOID is driven by two critical constraints: excess-power availability scores only 35/100, while grid constraint severity registers 52/100. For acquisition-focused investors, this combination signals material risk. Low excess-power availability means new capacity will face immediate competition for limited supply, pushing…
Published DC Hub data for this location.
Networks recorded as present at or immediately around AAPT Brisbane in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Further networks are recorded at this location beyond those listed here.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 36 operating generating units totalling 1,043 MW within about 50 km of Brisbane, AU. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Brisbane tracked by DC Hub — compare power, operators, and grid context across the market.