Verizon Memphis is a data center in Memphis, US. The facility is currently announced. It sits in the Memphis data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Memphis — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Memphis — the market this facility sits in (full deep-dive →).
Memphis operates a 5,617 MW installed base across 30 tracked facilities, but faces a structural underinvestment in power delivery relative to capacity demand. The excess-power score of 38/100 signals that available generation and transmission cannot reliably support expansion, while the constraint rating of 28/100—among the lowest quartile nationally—indicates severe interconnection and infrastructure bottlenecks. This combination reflects a market where existing capacity exceeds reliable delivery infrastructure, creating a ceiling on profitable utilization. The AVOID verdict is unambiguous for acquisition-focused investors. A constraint score of 28/100 means purchasing operational assets faces substantial risk of power-delivery delays, upgrade costs borne by operators, and potential production limitations during peak demand periods. Any acquisition would require budgeting for grid…
Published DC Hub data for this location.
Comparable facilities in Memphis tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="verizon-memphis-ec06fadd" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=verizon-memphis-ec06fadd