Vazata Dal I is a data center in Dallas, US. The facility is currently announced. It sits in the Dallas data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 66.6-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Dallas — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Dallas — the market this facility sits in (full deep-dive →).
Dallas operates at a critical inflection point: 372 tracked facilities totaling 7,013 MW face mounting power scarcity even as utilization rises. The market's DCPI excess-power score of 65/100 signals that available capacity remains adequate, but the constraint score of 60/100—measuring grid, interconnection, and thermal bottlenecks—introduces material friction for new deployments and expansions. This divergence is the market's defining characteristic: power exists, but getting it to the right buildings at the right time is increasingly problematic. Flexential's recent acquisition of 110 acres outside Dallas in Talty, explicitly targeting a 108 MW campus, reflects operator confidence in the region's fundamentals, though the multi-building phasing suggests deliberate pacing around infrastructure constraints. For acquisition-stage investors, the CAUTION verdict demands skepticism about…
Published DC Hub data for this location.
Comparable facilities in Dallas tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="vazata-dal-i-a66ac9d7" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=vazata-dal-i-a66ac9d7