US Signal Detroit is a data center operated by US Signal in Detroit, MI, US. It carries a reported power capacity of 8.0 MW and is currently operational. It sits in the Detroit data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 30.1-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Detroit — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Detroit — the market this facility sits in (full deep-dive →).
Detroit's data center footprint spans 42 tracked facilities totaling 1,116 MW, but the market is signaling mixed signals—excess-power availability sits at 51/100 while constraint risk stands at 53/100, warranting caution for new capital deployment. US Signal, Managedway, and 365 Data Centers each operate two facilities in the region, anchoring a fragmented operator base. The market has not yet seen major hyperscale M&A activity, despite regional momentum: Michigan utilities have committed to an 8+ GW data center pipeline expansion over five years, driven by Oracle and Google deals statewide, though these gains have not yet materialized into Detroit-specific tracked acquisitions. The CAUTION verdict reflects a market at an inflection point rather than an outright avoid signal. Unlike Washington, DC 35/100 excess-power, severe constraint or Birmingham 29/100 excess-power, acute scarcity,…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Detroit tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="us-signal-us-signal-detroit-45706299" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect