US Signal Detroit MI is a data center operated by US Signal in Detroit, MI, US. The facility is currently operational. It sits in the Detroit data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 29.9-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Detroit — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Detroit — the market this facility sits in (full deep-dive →).
Detroit's data center market comprises 27 tracked facilities totaling 1,122 MW, anchored by US Signal operating 2 sites, 365 Data Centers 2, and three single-facility operators including Centurylink and Cogent Communications. The market shows asymmetric risk: excess power capacity scores 59/100, suggesting modest headroom, but infrastructure constraints score 55/100, indicating meaningful friction in delivery, interconnection, or real estate availability. No recent M&A has been tracked in the Detroit footprint, signaling either market maturity or investor caution. The CAUTION verdict reflects a structural mismatch between power supply and operational deployment capacity. While Detroit is not facing acute power scarcity, constraint factors prevent operators and acquirers from freely converting available MW into operational revenue. Buyers should interpret this as: greenfield development…
Published DC Hub data for this location.
Comparable facilities in Detroit tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="us-signal-detroit-mi-a42424ce" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=us-signal-detroit-mi-a42424ce