OSM DC 283051485 is a data center operated by Unknown in US. The facility is currently operational. It sits in the Quincy data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 19.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Quincy — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Quincy — the market this facility sits in (full deep-dive →).
Quincy hosts 1,507 MW across 81 tracked facilities, making it a mid-sized regional hub, but operational constraints severely limit near-term expansion and acquisition appeal. The market is fragmented, with the top operator controlling only 22 facilities and Microsoft, Vantage Data Centers, and H5 Data Centers each maintaining modest presences of 4–7 sites. This distributed operator landscape contrasts sharply with consolidated markets like Washington, DC, where two players dominate, yet fragmentation here reflects structural weakness rather than opportunity—no single player has sufficient scale or control to drive consolidation momentum. The DCPI verdict of excess-power 49/100 and constraint 50/100 should trigger immediate avoidance for acquisition-stage investors. The excess-power score signals that available generation capacity is nearly saturated; the 49/100 reading means Quincy is…
Published DC Hub data for this location.
DC Hub tracks 7 operating generating units totalling 3,604 MW within about 50 km of US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
get_facility slug="unknown-osm-dc-283051485-625c0680" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect