OSM DC 1558344919 is a data center operated by Unknown. It sits in the Elk Grove data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 51.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Changes DC Hub has recorded to this facility’s record, newest first.
Data Center Power Index verdict for Elk Grove — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Elk Grove — the market this facility sits in (full deep-dive →).
Elk Grove's data center footprint remains modest and structurally constrained. The market comprises six tracked facilities totaling 122 MW, with Digital Realty operating two sites and Compass Datacenters, T5, and the Elk Grove Village municipal operator each maintaining single-asset positions. The excess-power DCPI score of 44/100 sits well below the 60+ threshold that signals healthy capacity availability, while the constraint index of 51/100 reflects moderate—but meaningful—operational friction around grid interconnection and utility coordination. The DCPI verdict of AVOID carries direct implications for acquisition and expansion strategies. A constraint score above 50 signals that new operators or existing players seeking to add capacity will encounter non-trivial delays in power procurement and grid upgrades; this is not merely a cost factor but a timeline risk. The excess-power…
Published DC Hub data for this location.
DC Hub tracks 57 operating generating units totalling 3,701 MW within about 50 km of this location. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
get_facility slug="unknown-osm-dc-1558344919-b1ff77da" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: