Unknown HCA Information Technology & Services Data Center

Last updated

HCA Information Technology & Services Data Center is a data center operated by Unknown in Nashville, TN, US. The facility is currently operational. It sits in the Nashville data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Nashville
State
TN
Country
US

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Nashville — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Nashville — the market this facility sits in (full deep-dive →).

Nashville's data center footprint remains modest at 112 MW across 57 tracked facilities, with Flexential commanding the largest operational presence at 8 facilities. The market is fragmented: the top five operators control only 22 of 57 sites, leaving significant capacity distributed among smaller players and unidentified operators 7 facilities. This fragmentation reflects limited institutional consolidation and suggests the market has not attracted sustained large-scale capital deployment despite Nashville's geographic and cost advantages relative to coastal hubs. The DCPI verdict of AVOID—driven by excess-power scoring of 36/100 paired with constraint scoring of 30/100—presents a dual headwind for acquisition-stage investors. The excess-power metric signals that available grid capacity cannot reliably support incremental tenant load without infrastructure upgrades; at 36/100,…

Location

Area Nashville, TN, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketNashville
Grid operatorTVA
Data Center Power IndexAVOID
Est. time to power10.9 months
LocationNashville, US
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 15 operating generating units totalling 2,086 MW within about 50 km of Nashville, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal1,255 MW · 4 units · 60%
Oil/Gas664 MW · 8 units · 32%
Hydropower162 MW · 1 unit · 8%
Utility-Scale Solar5 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Nashville tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="unknown-hca-information-technology-services-data-center-04ba4106" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind