CyrusOne PHX3 — Chandler Data Center

CyrusOne PHX3 is a data center operated by CyrusOne in Chandler, AZ, US. The facility is currently operational. It sits in the Chandler data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 12.2-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.

Status
Operational
Market
Phoenix
City
Chandler
State
AZ
Country
US

Market intelligence

BUILD

Data Center Power Index verdict for Chandler — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Chandler — the market this facility sits in (full deep-dive →).

Chandler hosts a modest but operationally strained cluster of 27 facilities totaling 143 MW across a fragmented operator base. CyrusOne leads with 10 facilities, followed by an unknown operator controlling 6 MW, and H5 Data Centers with 3 facilities. The remaining capacity is distributed among Digital Realty 2 facilities and Evoque 1, with no single player commanding market dominance. This operator fragmentation mirrors broader Arizona dynamics, where regional consolidation remains limited compared to mature markets like Phoenix, which operates 280 facilities and 4,735 MW total capacity. The DCPI verdict of CAUTION warrants careful deal structuring here. While excess-power scores 63/100—indicating adequate near-term capacity—the constraint rating of 37/100 signals material grid and infrastructure headwinds. This divergence creates a specific risk profile: investors can access power in…

Location

Area Chandler, AZ, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketChandler
Grid operatorWECC
Data Center Power IndexBUILD
Est. time to power12.2 months
LocationChandler, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around CyrusOne PHX3 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Amazon.comArelion (Twelve99)BSOBackblaze IncCCRCogent Communications, Inc.CyrusOneEdgio - AS22822GRTI-NWGTT Communications (AS3257)H5 Data Centers ChandlerHOOP7NETWORK

Further networks are recorded at this location beyond those listed here.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 92 operating generating units totalling 8,395 MW within about 50 km of Chandler, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas6,819 MW · 59 units · 81%
Utility-Scale Solar1,368 MW · 30 units · 16%
Hydropower208 MW · 3 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Chandler tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cyrusone-cyrusone-phx3-447f89d0" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind