CyrusOne PHX1 is a data center operated by CyrusOne in Chandler, AZ, US. The facility is currently operational.
Source: OpenStreetMap · As of: · Basis: cited (what this means)
CyrusOne PHX1 is one of 27 facilities DC Hub’s Chandler brief counts on the WECC grid. The closest tracked facility is CyrusOne Phoenix, under 1 km away, and the nearest mapped substation is within 1 km. Read the Chandler market brief →
Published DC Hub data for this location.
Networks recorded as present at or immediately around CyrusOne PHX1 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Further networks are recorded at this location beyond those listed here.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 92 operating generating units totalling 8,395 MW within about 50 km of Chandler, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
get_facility slug="cyrusone-cyrusone-phx1-dbd6a8d0" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect