Turk Telekom Edirne-1-54 is a data center operated by Turk Telekomunikasyon Anonim Sirketi in Edirne, Merkez, TR. It carries a reported power capacity of 3.0 MW and is currently operational.
Published DC Hub data for this location.
Comparable facilities in Edirne tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="turk-telekomunikasyon-anonim-sirketi-turk-telekom-edirne-1-54-6985099a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=turk-telekomunikasyon-anonim-sirketi-turk-telekom-edirne-1-54-6985099a