TierPoint Tulsa is a data center operated by TierPoint in Tulsa, OK, US. It carries a reported power capacity of 4.0 MW and is currently operational. It sits in the Tulsa data-center market on the SPP grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 23.1-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Tulsa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Tulsa — the market this facility sits in (full deep-dive →).
Tulsa's data center footprint remains fragmented and underdeveloped, with 25 tracked facilities totaling just 34 MW across a shallow operator base. TierPoint operates the largest presence with 6 MW across two entities, while Compass Datacenters Tulsa I and unnamed operators control smaller slices. The market lacks consolidation; no recent M&A has been tracked. This atomization, combined with a DCPI excess-power reading of 76/100, signals acute supply-side imbalance—operators have built capacity that demand has not yet absorbed. The BUILD verdict is unambiguous for patient capital. The excess-power score of 76 means Tulsa has exceptional headroom for new construction without facing grid constraints; a constraint score of 49 indicates moderate transmission and cooling limitations that are manageable at the development stage, not prohibitive. For greenfield entrants or build-to-suit…
Published DC Hub data for this location.
Comparable facilities in Tulsa tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="tierpoint-tulsa-769f95eb" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=tierpoint-tulsa-769f95eb