Centurylink Tulsa is a data center in Tulsa, US. The facility is currently announced. It sits in the Tulsa data-center market on the SPP grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 23.6-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Tulsa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Tulsa — the market this facility sits in (full deep-dive →).
Tulsa's data center footprint remains nascent, with 23 tracked facilities totaling 34 MW across a fragmented operator base. TierPoint is the largest identifiable player, operating 6 MW across multiple entities TierPoint and TierPoint, LLC combined account for 4 MW, while the majority of capacity—likely 6 MW or more—remains under unknown ownership. Jackson Technical operates a single smaller facility. This distribution suggests significant white-space opportunity and minimal incumbent lock-in, a condition rarely found in mature markets. The DCPI verdict of BUILD is a strong greenfield signal, driven by Tulsa's excess-power score of 76/100 paired with moderate constraint conditions at 49/100. This combination indicates that power availability is abundant relative to current demand, making new construction economically viable without reliance on aging infrastructure or expensive grid…
Published DC Hub data for this location.
Comparable facilities in Tulsa tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="centurylink-tulsa-04369cb9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=centurylink-tulsa-04369cb9