TierPoint Baltimore – BWI

TierPoint

TierPoint Baltimore – BWI is a data center operated by TierPoint in Linthicum Heights, MD, US. The facility is currently operational. It sits in the Linthicum Heights data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 8.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
City
Linthicum Heights
State
MD
Country
US
Coordinates
39.2138, -76.6799
Address
813 Pinnacle Drive

Market intelligence

AVOID

Data Center Power Index verdict for Linthicum Heights — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Linthicum Heights — the market this facility sits in (full deep-dive →).

Linthicum Heights hosts a fragmented, underdeveloped data center footprint with zero operational megawatts across five tracked facilities. The market is dominated by TierPoint, which operates multiple sites in the area, alongside smaller players like Tunbroker LLC and an untracked operator. No recent M&A activity has materialized, and the aggregate portfolio shows minimal scale—a stark contrast to consolidation dynamics in adjacent Maryland markets where energy law changes and multi-billion-dollar fund formations have accelerated regional competition. The DCPI verdict of AVOID reflects structural constraints that make this market unsuitable for acquisition-stage investors. An excess-power score of 35/100 signals insufficient power density or availability relative to market demand, while a constraint score of 29/100 indicates severe operational or infrastructure limitations—likely tied…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketLinthicum Heights
Grid operatorPJM
DC Hub Power IndexAVOID
Est. time to power8.2 months
LocationLinthicum Heights, US

Power generation nearby

DC Hub tracks 128 operating generating units totalling 3,520 MW within about 50 km of Linthicum Heights, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal1,370 MW · 2 units · 39%
Oil/Gas1,266 MW · 7 units · 36%
Hydropower531 MW · 1 unit · 15%
Utility-Scale Solar264 MW · 115 units · 7%
Bioenergy89 MW · 3 units · 3%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Linthicum Heights tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="tierpoint-tierpoint-baltimore-bwi-b4ca22a1" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=tierpoint-tierpoint-baltimore-bwi-b4ca22a1
Schema, units and the population behind every count: https://dchub.cloud/bind