TierPoint is a data center in Andover, MA, US. The facility is currently operational. It sits in the Andover data-center market on the ISONE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 11.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Andover — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Andover — the market this facility sits in (full deep-dive →).
Andover's data center footprint remains modest at 9 MW across 4 tracked facilities, dominated by TierPoint's dual-facility presence. The market is operationally fragmented, with TierPoint controlling two sites and NaviSite LLC and a separate TierPoint entity each managing one facility. This four-operator structure on limited capacity suggests a market that has not yet consolidated, leaving potential acquisition targets scattered across small holdings. The DCPI verdict of AVOID carries direct implications for acquisition-focused investors. The excess-power score of 29/100 signals that available capacity is severely constrained—this is not a market where buyers can acquire a facility and rely on unutilized power to drive incremental revenue. Simultaneously, the constraint score of 38/100 indicates that even existing infrastructure faces meaningful limitations, likely around transmission,…
Published DC Hub data for this location.
Comparable facilities in Andover tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="tierpoint-673708fc" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=tierpoint-673708fc