Navisite Andover is a data center operated by NaviSite LLC in Andover, MA, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Andover data-center market on the ISONE grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 18.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Andover — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Andover — the market this facility sits in (full deep-dive →).
Andover's data center footprint remains minimal and constrained. The tracked market comprises only 4 facilities totaling 9 MW of capacity, dominated by TierPoint with two sites and split participation from NaviSite LLC and TierPoint, LLC. This fragmented operator base and sub-10 MW scale underscore Andover's status as a secondary market with negligible strategic relevance for major capital deployment. The DCPI verdict of AVOID is unambiguous for acquisition-focused buyers and operators. The excess-power rating of 29/100 signals razor-thin headroom for incremental workload placement, while the constraint score of 38/100 reflects structural limitations in grid interconnection, real estate availability, or both. Combined, these metrics indicate that existing facilities operate near practical utilization ceilings, eliminating the capacity runway that drives acquisition ROI. For investors…
Published DC Hub data for this location.
Comparable facilities in Andover tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="navisite-llc-navisite-andover-2e2469de" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=navisite-llc-navisite-andover-2e2469de