TeraWulf Lake Mariner CB-5 is a data center operated by TeraWulf / Fluidstack in Seneca Falls, NY, US. It carries a reported power capacity of 200.0 MW and is currently under construction. It sits in the Syracuse data-center market on the NYISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 22.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Syracuse — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Syracuse — the market this facility sits in (full deep-dive →).
Syracuse's data center market remains decidedly underdeveloped, with only 3 tracked facilities delivering 6 MW of total capacity—a footprint smaller than most single-site deployments in mature markets. The market is fragmented across three operators, each holding a single facility: Lightboard, Northland Communications, and Westelcom Networks. No recent M&A activity has been recorded, suggesting limited investor interest and minimal consolidation pressure in the region. The DCPI verdict of CAUTION reflects a market caught between competing constraints. An excess-power score of 41/100 signals structural undersupply—available grid capacity relative to facility demand is lean, meaning new entrants will face real headroom limitations and operators cannot easily scale existing assets. Simultaneously, the constraint rating of 47/100 indicates moderate real estate, zoning, or infrastructure…
Published DC Hub data for this location.
Comparable facilities in Seneca Falls tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a