Telia Carrier Austria GmbH

Last updated

Telia Carrier Austria GmbH is a data center in St. Pölten, AT. The facility is currently operational. It sits in the Vienna data-center market on the ENTSOE-AT grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 42.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
St. Pölten
Country
AT

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

AVOID

Data Center Power Index verdict for Vienna — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Vienna — the market this facility sits in (full deep-dive →).

Vienna's data center market is heavily fragmented across 109 tracked facilities with zero operational megawatts currently online, dominated by a five-way tie among leading operators each holding just 5 facilities, followed by Raiffeisen Informatik GmbH & Co KG and Equinix with 3 facilities each. The market shows minimal institutional consolidation—no recent M&A activity has been tracked—suggesting either an immature buy-sell cycle or structural barriers to deal formation. This lack of transaction history stands in sharp contrast to larger European peers and indicates either strategic stasis or fundamental market challenges deterring investors. The DCPI verdict of AVOID reflects a market caught between two opposing constraints that should pause acquisition activity. An excess-power score of 27/100 signals severe power scarcity—Vienna lacks sufficient grid capacity or generation…

Location

Street Herrmanngasse
Area St. Pölten, AT

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketVienna
Grid operatorENTSOE-AT
Data Center Power IndexAVOID
Est. time to power42.8 months
LocationSt. Pölten, AT

Power generation nearby

DC Hub tracks 50 operating generating units totalling 1,814 MW within about 50 km of St. Pölten, AT. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Hydropower1,045 MW · 4 units · 58%
Oil/Gas526 MW · 3 units · 29%
Utility-Scale Solar125 MW · 35 units · 7%
Wind108 MW · 7 units · 6%
Bioenergy10 MW · 1 unit · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="telia-carrier-austria-gmbh-telia-carrier-austria-gmbh-57d17310" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind