TM ONE CBJ1, Cyberjaya is a data center operated by Telekom Malaysia Berhad (TM) in Cyberjaya, Selangor, MY. The facility is currently operational. It sits in the Kuala Lumpur data-center market on the TNB grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 19.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Kuala Lumpur — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Kuala Lumpur — the market this facility sits in (full deep-dive →).
Kuala Lumpur's data center market comprises 84 tracked facilities with 876 MW of total capacity, dominated by a fragmented operator base where the largest players—TM Nxera, AIMS Data Centre Sdn Bhd, and Equinix—each operate only two facilities, while hyperscalers maintain minimal footprints AWS operates a single tracked facility. The market's excess-power index of 39/100 indicates significant idle capacity relative to demand, suggesting oversupply conditions that have depressed utilization rates across the installed base. The DCPI verdict of AVOID reflects a dual constraint problem: the excess-power score of 39/100 signals that buyers would face a saturated leasing environment with weak pricing power, while the constraint score of 42/100—measuring regulatory, infrastructure, and land-use barriers—indicates moderate operational friction that raises development costs without offsetting…
Published DC Hub data for this location.
Networks recorded as present at or immediately around TM ONE CBJ1, Cyberjaya in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 61 operating generating units totalling 9,983 MW within about 50 km of Cyberjaya, MY. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Cyberjaya tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="telekom-malaysia-berhad-tm-tm-one-cbj1-cyberjaya-591032ef" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect