Systemec Venlo DC19

Systemec
📍 Venlo

Systemec Venlo DC19 is a data center operated by Systemec in Venlo. It sits in the Rotterdam data-center market on the ENTSOE-NL grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 102.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

City
Venlo
Coordinates
51.3784, 6.1589
Address
Marinus Dammeweg

Market intelligence

AVOID

Data Center Power Index verdict for Rotterdam — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Rotterdam — the market this facility sits in (full deep-dive →).

Rotterdam's data center market remains nascent and structurally constrained, with 42 tracked facilities totaling 0 MW of measurable capacity. The market's excess-power score of 22/100 indicates severe undersupply relative to infrastructure maturity, while the constraint score of 66/100 reflects acute bottlenecks in grid access, fiber routing, or real estate availability. Fragmentation is pronounced: NorthC Datacenters leads with 3 facilities, followed by two operators with 3 facilities each, and a long tail of single-asset holders including Alticom Den and multiple unknown entities. The DCPI's AVOID verdict for acquisition investors is unambiguous and justified by Rotterdam's dual deficit—neither sufficient power surplus nor operational scale exists to support entry-stage capital deployment. Buyers seeking to acquire, consolidate, or expand face a market that cannot reliably absorb…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketRotterdam
Grid operatorENTSOE-NL
DC Hub Power IndexAVOID
Est. time to power102.9 months

Power generation nearby

DC Hub tracks 299 operating generating units totalling 12,660 MW within about 50 km of Venlo. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal5,388 MW · 7 units · 43%
Oil/Gas5,180 MW · 30 units · 41%
Utility-Scale Solar1,154 MW · 217 units · 9%
Wind766 MW · 40 units · 6%
Bioenergy172 MW · 5 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Venlo tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="systemec-venlo-dc19-3f1f2a0a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=systemec-venlo-dc19-3f1f2a0a
Schema, units and the population behind every count: https://dchub.cloud/bind