Switch LAS VEGAS 8

Switch LAS VEGAS 8 is a data center operated by Switch in Las Vegas, NV, US. It carries a reported power capacity of 130.0 MW and is currently operational. It sits in the Las Vegas data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 11.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Power
130.0 MW
Status
Operational
Market
Las Vegas
State
NV
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Las Vegas — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Las Vegas — the market this facility sits in (full deep-dive →).

Las Vegas operates 77 tracked facilities totaling 1,840 MW, but faces a critical power availability bottleneck. The DCPI scoring reveals excess-power capacity at 53/100 paired with constraint severity at 37/100—a divergence that signals adequate installed generation alongside transmission and infrastructure friction. Switch dominates the local operator landscape with 16 facilities, followed by Flexential with 6, creating a moderately concentrated market where the top operator controls roughly 21% of tracked capacity. Recent activity shows zero M&A transactions closed, with only speculative pipeline values $350M unconfirmed suggesting dealmakers remain sidelined. The CAUTION verdict reflects structural realities that should deter most acquisition strategies while leaving selective build opportunities open. High excess-power scoring 53/100 indicates Las Vegas has not hit absolute power…

Location

Area Las Vegas, NV, US

Exact location not on record.

Market & grid context

Published DC Hub data for this location.

MarketLas Vegas
Grid operatorWECC
Data Center Power IndexCAUTION
Est. time to power11.5 months
LocationLas Vegas, US
Reported capacity130.0 MW

Other data centers nearby

Comparable facilities in Las Vegas tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="switch-switch-las-vegas-8-e089b286" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind