Switch is a data center in Enterprise, NV, US. The facility is currently operational. It sits in the Enterprise data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 9.5-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Enterprise — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Enterprise — the market this facility sits in (full deep-dive →).
The Enterprise segment tracks just 4 facilities representing 0 MW of operational capacity, signaling an immature or consolidating market segment with minimal established infrastructure. The excess-power index stands at 55/100—above the midline but not indicating acute surplus—while the constraint score of 31/100 reflects moderate limitations on expansion or power availability. This combination suggests a market neither flooded with idle capacity nor critically strained, but one operating in a precarious middle ground where supply-demand equilibrium remains fragile. The CAUTION verdict reflects structural uncertainty that should give pause to acquisition-focused investors and operators. A constraint score of 31/100 indicates that power delivery, grid connectivity, or permitting hurdles are material headwinds; simultaneously, the 55/100 excess-power reading means new entrants cannot…
Published DC Hub data for this location.
DC Hub tracks 92 operating generating units totalling 12,508 MW within about 50 km of Enterprise, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Enterprise tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="switch-switch-33e0be1e" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect