Stellium 2 & 3

Stellium 2 & 3 is a data center operated by Stellium Datacentres Limited in Newcastle, Tyne & Wear, GB. The facility is currently operational. It sits in the Edinburgh data-center market on the NGESO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 122.4-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Newcastle
State
Tyne & Wear
Country
GB

Market intelligence

AVOID

Data Center Power Index verdict for Edinburgh — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Edinburgh — the market this facility sits in (full deep-dive →).

Edinburgh's data center market remains modest and constrained, with just 18 tracked facilities delivering 25 MW of aggregate capacity across a fragmented operator base. Pulsant dominates with a 6 MW footprint, while banking incumbents Lloyds, NatWest maintain single-facility presences, signaling legacy rather than growth positioning. The market has recorded no tracked M&A activity in recent periods, reinforcing its status as a low-velocity investment corridor. The DCPI verdict of AVOID reflects a market ill-suited to acquisition-led capital deployment. The excess-power score of 23/100 signals acute undersupply relative to regional demand trajectories, while the constraint reading of 63/100 indicates moderate-to-high operational friction—likely tied to grid interconnection delays, planning lead times, or real estate availability. For buyers seeking to acquire operating assets or…

Location

Area Newcastle, Tyne & Wear, GB

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketEdinburgh
Grid operatorNGESO
Data Center Power IndexAVOID
Est. time to power122.4 months
LocationNewcastle, GB

Fiber connectivity

Networks recorded as present at or immediately around Stellium 2 & 3 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Aspire Technology SolutionsBSOBroadband for the Rural North (B4RN)COMPUTLEFort TechnologiesGoFibreIX ReachStellium Networks (UK)VoltHostingZayo

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 70 operating generating units totalling 2,862 MW within about 50 km of Newcastle, GB. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Nuclear1,310 MW · 2 units · 46%
Bioenergy600 MW · 10 units · 21%
Wind529 MW · 41 units · 18%
Oil/Gas376 MW · 6 units · 13%
Utility-Scale Solar48 MW · 11 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Newcastle tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="stellium-datacentres-limited-stellium-2-3-fca89c64" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind