Starkville Starkville, Mi is a data center operated by Starkville in Starkville, Mi, US. It carries a reported power capacity of 30.0 MW and is currently planned. It sits in the Byron Center data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 28.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Byron Center — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Byron Center — the market this facility sits in (full deep-dive →).
Byron Center's data center market remains nascent and undersized, with only three tracked facilities totaling 0 MW of deployed capacity across three regional operators: 123.Net, LLC., ManagedWay Company, and US Signal, each operating a single site. The market's DCPI scoring reflects structural constraints: an excess-power rating of 56/100 indicates moderate supply-side vulnerability, while a constraint score of 52/100 signals ongoing interconnection and infrastructure limitations. This combination places Byron Center below the threshold for large-scale hyperscale deployment and positions it as a secondary market within Michigan's broader data center ecosystem. The CAUTION verdict carries direct implications for acquisition-stage investors and operators evaluating entry or expansion. A score below 65/100 on constraint metrics disqualifies Byron Center from near-term greenfield…
Published DC Hub data for this location.
Comparable facilities in Starkville tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="starkville-starkville-mi-db0bc247" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=starkville-starkville-mi-db0bc247