STACK SVY03 Hayward is a data center operated by STACK Infrastructure in Hayward, CA, US. It carries a reported power capacity of 77.0 MW and is currently under construction. It sits in the Emeryville data-center market on the CAISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 38.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Emeryville — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Emeryville — the market this facility sits in (full deep-dive →).
Emeryville remains a micro-scale market with fragmented infrastructure and conflicting supply-demand signals. The market tracks only 5 facilities totaling 0 MW of deployed capacity, indicating either early-stage development or incomplete market coverage. The DCPI excess-power score of 62/100 suggests moderate oversupply conditions, while the constraint index of 54/100 points to mid-tier interconnection and infrastructure limitations—a mixed signal that resists straightforward interpretation. The CAUTION verdict reflects genuine structural risks for entry-stage investors. An excess-power score above 60 typically signals that available capacity outpaces near-term demand absorption, compressing margins and extending payback horizons. Simultaneously, the constraint score of 54 indicates that physical or regulatory bottlenecks may prevent rapid scaling even if demand materializes. For…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Hayward tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="stack-infrastructure-stack-svy03-hayward-ddf8461e" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect