STT Kuala Lumpur 1 is a data center operated by ST Telemedia Global Data Centres (STT GDC) in Cyberjaya, Selangor, MY. The facility is currently operational. It sits in the Kuala Lumpur data-center market on the TNB grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 19.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Kuala Lumpur — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Kuala Lumpur — the market this facility sits in (full deep-dive →).
Kuala Lumpur's data center market comprises 84 tracked facilities with 876 MW of total capacity, dominated by a fragmented operator base where the largest players—TM Nxera, AIMS Data Centre Sdn Bhd, and Equinix—each operate only two facilities, while hyperscalers maintain minimal footprints AWS operates a single tracked facility. The market's excess-power index of 39/100 indicates significant idle capacity relative to demand, suggesting oversupply conditions that have depressed utilization rates across the installed base. The DCPI verdict of AVOID reflects a dual constraint problem: the excess-power score of 39/100 signals that buyers would face a saturated leasing environment with weak pricing power, while the constraint score of 42/100—measuring regulatory, infrastructure, and land-use barriers—indicates moderate operational friction that raises development costs without offsetting…
Published DC Hub data for this location.
Networks recorded as present at or immediately around STT Kuala Lumpur 1 in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Further networks are recorded at this location beyond those listed here.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 60 operating generating units totalling 9,980 MW within about 50 km of Cyberjaya, MY. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Cyberjaya tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="st-telemedia-global-data-centres-stt-gdc-stt-kuala-lumpur-1-807851f9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: