SoftBank Ohio is a data center operated by SoftBank in OH, US. It carries a reported power capacity of 10000.0 MW and is currently planned. It sits in the Canton data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 15.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Canton — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Canton — the market this facility sits in (full deep-dive →).
Canton's data center footprint consists of 1,000 MW across five tracked facilities, anchored by Amazon Web Services operating two sites alongside single-asset operators LightSpeed Technologies, SecureData 365, and ark data centers. The market presents a fragmented asset base with no dominant single operator beyond AWS's dual presence, creating potential acquisition targets but within a constrained operational environment. The current competitive structure suggests modest consolidation opportunities, though the power infrastructure presents material headwinds that offset traditional M&A appeal. The DCPI verdict of AVOID carries specific weight for acquisition-focused investors: both the excess-power score of 39/100 and constraint score of 39/100 indicate symmetrical power stress across availability and reliability dimensions. This dual weakness distinguishes Canton from less constrained…
Published DC Hub data for this location.
Comparable facilities in OH tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="softbank-softbank-ohio-17e63de3" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=softbank-softbank-ohio-17e63de3