SKYLINK DATA CENTERS is a data center in Naples, FL, US. The facility is currently operational. It sits in the Doral data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 15.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Doral — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Doral — the market this facility sits in (full deep-dive →).
Doral's data center market remains nascent and underdeveloped, with only 5 tracked facilities representing 0 MW of operational capacity across a fragmented operator base. The market hosts CoreSite, Equinix operating two separate facilities, NocRoom Miami IT Services, and one unidentified operator, indicating no dominant player and minimal scale concentration. This operator fragmentation mirrors regional patterns seen in nearby markets like Orlando and Tampa, where sparse infrastructure has constrained institutional investment and deal velocity. The DCPI verdict of AVOID reflects fundamental structural constraints that should deter acquisition-focused investors and capacity-constrained operators. The excess-power score of 43/100 signals inadequate or unreliable power provisioning relative to regional demand, while the constraint score of 39/100 indicates significant operational or…
Published DC Hub data for this location.
Networks recorded as present at or immediately around SKYLINK DATA CENTERS in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.
Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.
DC Hub tracks 1 operating generating unit totalling 74 MW within about 50 km of Naples, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Naples tracked by DC Hub — compare power, operators, and grid context across the market.