Sipartech SAS BB1 — Boulogne-Billancourt Data Center

BB1 is a data center operated by Sipartech SAS in Boulogne-Billancourt, FR. The facility is currently operational. It sits in the Paris data-center market on the ENTSOE-FR grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 33.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Boulogne-Billancourt
Country
FR

Market intelligence

AVOID

Data Center Power Index verdict for Paris — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Paris — the market this facility sits in (full deep-dive →).

Paris operates 323 tracked facilities totaling 356 MW across a fragmented operator base. The market's DCPI rating of excess-power 27/100 and constraint 55/100 yields a clear AVOID verdict for new investment. This positioning reflects structural imbalance: while power availability is critically tight 27/100 suggests severe undersupply, operational constraints remain moderate but non-trivial, creating a pincer effect that penalizes new entrants and expansion-stage operators. For acquisition-focused buyers, the AVOID verdict signals heightened execution risk on two fronts. The excess-power score of 27/100 is the more pressing concern—it indicates Paris lacks sufficient available grid capacity to support incremental colocation demand without substantial infrastructure upgrades. Buyers cannot rely on plug-and-play commissioning; any acquisition would require negotiation with local grid…

Location

Area Boulogne-Billancourt, FR

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketParis
Grid operatorENTSOE-FR
Data Center Power IndexAVOID
Est. time to power33.6 months
LocationBoulogne-Billancourt, FR

Power generation nearby

DC Hub tracks 49 operating generating units totalling 1,915 MW within about 50 km of Boulogne-Billancourt, FR. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,427 MW · 11 units · 75%
Utility-Scale Solar262 MW · 29 units · 14%
Bioenergy147 MW · 4 units · 8%
Wind79 MW · 5 units · 4%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Boulogne-Billancourt tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="sipartech-sas-bb1-ffcd2303" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind