Segro Slough, UK is a data center operated by Segro in Slough, UK, US. It carries a reported power capacity of 50.0 MW and is currently planned. It sits in the Edinburgh data-center market on the NGESO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 122.1-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Edinburgh — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Edinburgh — the market this facility sits in (full deep-dive →).
Edinburgh's data center footprint remains modest at 25 MW across 16 tracked facilities, concentrated among a small cohort of operators with limited recent consolidation activity. Pulsant dominates the market with 6 facilities, while banking-sector operators—Lloyds Banking Group and NatWest Group—maintain single-facility presence, likely serving internal enterprise demand rather than colocation services. The market shows no recent M&A tracked, suggesting limited investor appetite and incumbent operator entrenchment around legacy workloads. The DCPI verdict of AVOID—driven by a constraint score of 63/100 paired with excess-power availability of 23/100—presents a paradoxical but decisive investment barrier. The constraint figure signals that grid and cooling infrastructure cannot reliably support rapid operational scaling, eliminating the operational flexibility required for acquisitions…
Published DC Hub data for this location.
get_facility slug="segro-segro-slough-uk-dbdc304c" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=segro-segro-slough-uk-dbdc304c